I expected technical screens for an engineering project manager role. Instead, nearly every round was about projects I’d already run.
Interview process
The whole thing took about two months. It opened with what felt more like a hiring manager chitchat than an interview, then moved into two compliance-heavy rounds. After that I had a two-day onsite with cross-functional people and a live case at the end. What surprised me was I went in expecting technical screens, but pretty much the whole loop was behavioral and execution focused around work I had already done. I never really felt caught off guard because they kept bringing it back to my own projects.
Interview rounds · 3
- 1
Phone screen
BehavioralConceptThis first conversation honestly felt more like a chitchat with the hiring manager than a real screen, just checking whether I knew the space and could talk at a high level about the work.
Q1. Do you know this space, and what are some of the use cases you can think of?
How they answeredI treated it like a high-level intro. I talked through my background, showed that I understood the space I was interviewing for, and shared some use cases I could think of. It did not feel like a hard screen at all. They also checked practical things like where I was based and how quickly I could join.
- 2
Technical round
BehavioralProject ManagementCross-FunctionalThese two rounds were deep dives into compliance, security, regulatory, and legal angles, and the questions stayed tied to projects I had actually done.
Q1. How would you plan a project before software development life cycle kicks in?
How they answeredI answered it from my own work. I laid out how I would define the project before SDLC starts, what I would lock down early, and how I think about risks up front instead of later. They pushed on how I make sure the plan is really defined before the team starts building, so I stayed concrete and process-oriented.
Follow-up questions- How would you manage risks?
- How do you make sure that the project plans are defined before a project has started?
Q2. Walk me through the compliance side, including the security, regulatory, and legal requirements.
How they answeredThey went pretty deep on compliance. I talked through how I handle the security angle and how regulatory and legal requirements feed into planning before execution starts. The whole discussion was anchored in work I had really done, so it felt more like a deep dive into my experience than a quiz.
- 3
Final / onsite round
BehavioralProject ManagementExecutionCross-FunctionalThe onsite was spread over two days with cross-functional people from engineering, QA, product, security, and another EPM, and it stayed behavioral until the last live case.
Q1. Tell me about a complex project you did.
How they answeredA lot of the onsite felt like this. I had to walk through complex projects I had done and explain how I handled planning, coordination, and risk. Nothing really felt designed to catch me off guard. They kept it tied to my actual experience, which made the conversations pretty straightforward if you had real examples.
Follow-up questions- How did you handle planning and coordination?
- How did you deal with risks?
Q2. How would you plan and run a phased rollout of identity documents in Apple Wallet?
How they answeredI walked them through it end to end. I started with discovery, then how I would phase the rollout through the software lifecycle, what the QA phase should look like, what metrics I would monitor after launch, and then the maintenance piece. It was basically a full lifecycle case, not a coding or technical design round.
Follow-up questions- Walk through each phase end to end: discovery, development, QA, post-launch metrics, and maintenance.
Tips from the candidate
I would go in with really sharp stories on a complex project, how you manage risks, and how you define the plan before SDLC even starts, because that came up a lot. The case at the end was very end to end, so I would also practice walking a rollout in phases from discovery to development, QA, metrics, and maintenance without losing the thread.
Company culture
The people I met were warm, but the company is very private in how they talk. Even when I asked about recent challenges they had faced on projects, they kept it generic and would not really get into specifics. That guardedness felt consistent across how they asked questions, how they answered mine, and how tightly they handled information.